Rīga, Zolitūdes iela 89, LV-1046

Scaffolding image

Scaffolding

STORENT offers scaffolding structures from the world's largest scaffolding manufacturer Wilhelm Layher GmbH & Co KG from Germany. Thanks to the wide range of parts, they have many different uses:

  • building construction;
  • construction of roads, bridges and industrial facilities;
  • manufacturing industry;
  • event and advertising industry.

STORENT provides all necessary documentation and technical drawings. In addition, scaffold assembly/disassembly and transportation services are also offered, as well as the creation of scaffold protective coverings with scaffold mesh/tarpaulin and heat shrink film.

Layher construction scaffolding

Layher sastatnes

Wilhelm Layher GmbH & Co.KG (Layher) is one of the leading manufacturers of scaffolding and its components in the world.

The wide range of parts and additional elements ensures their application:

  • in construction sites (for facade decoration, bricklaying, construction assembly, supporting formwork structures)
  • in road construction and industrial sites (bridge and viaduct construction, power plants, hydropower plants, shipyards)
  • in industrial sites (both during their construction process and daily maintenance)
  • in the field of event organization and advertising (construction of stages, stands, advertising stands)

SIA "STORENT" offers you frame scaffolding "Layher Speedy Scaf" and modular scaffolding "Layher Allround", providing you with all the necessary documentation and working drawings. In addition, we also offer scaffolding assembly/dismantling services as well as scaffolding covering using a net (to protect the environment from dust and construction debris) or a facade film (to protect the object from environmental effects - low temperatures, precipitation).

Facade scaffolding

Frame facade scaffolding "Layher Speedy scaffold"

The main field of application of the frame scaffolding Layher Speedy Scaf is facade work.

Their structures consist of galvanized steel components. They are certified and meet all safety and work technology requirements. Thanks to a very wide range of additional equipment, as well as the ability to combine them with modular scaffolding, they ensure optimal adaptability to any facade configuration, and allow you to always find the most convenient and economically advantageous solution for each object.

The standard Speedy Scaf structure consists of only six basic elements (footings, frames, decks, diagonals, railings and side boards), which provides the fastest and most convenient assembly for simple facades up to a height of 80 m. Higher heights require additional calculations and the use of additional parts, and the maximum height is practically unlimited.

 

Modular scaffolding

Modular scaffolding "Layher Allround"

Layher Allround modular scaffolding consists of industrially manufactured galvanized steel components – verticals, horizontals and diagonals. Flanges are welded to the verticals every 50 cm, into which the horizontals and diagonals are fastened with wedge-shaped joints. Such a design ensures high spatial stability. This scaffolding is mainly used in various complex industrial facilities at great heights and under heavy loads.

As horizontals can be assembled every 50 cm, the deck height can also be varied in increments of 50 cm, which is especially necessary when performing masonry work, which is why modular scaffolding is a popular solution for bricklayers.

The wide range of horizontals and deck lengths ensures the creation of platforms of practically any size, which is very useful for large-scale ceiling finishing works in halls, staircases, etc.

Modular scaffolding is also used to create spatial structures for placing advertising posters in places where the creation of stationary structures is not possible or necessary.

Stair towers

Stair towers are also assembled from modular scaffolding elements, which serve as an optimal temporary solution for the movement of people between floors during the construction of buildings until stationary stairs are installed.

They can also be combined with facade and modular scaffolding, thus making it more convenient to move people and materials between the floors of the scaffolding.

Watch the video from our project

Storent temporary roof and scaffolding construction during the renovation of the Kupfers House

Scaffolding for the renovation of the facade of the Small Guild Hall

Andris Bisofs scaffolding

Andris Bišofs

Scaffolding project manager.

+371 28 690 692

[email protected]